{"id":27397,"date":"2023-04-27T15:45:19","date_gmt":"2023-04-27T22:45:19","guid":{"rendered":"https:\/\/phoseon.com\/?post_type=in_the_news&p=27397"},"modified":"2023-04-27T16:22:07","modified_gmt":"2023-04-27T23:22:07","slug":"go-green-with-phoseon-technology-to-save-green-with-titan-energy","status":"publish","type":"in_the_news","link":"https:\/\/phoseon.com\/de\/in-the-news\/go-green-with-phoseon-technology-to-save-green-with-titan-energy\/","title":{"rendered":"Go Green with Phoseon Technology to Save Green with Titan Energy"},"content":{"rendered":"\n

Discover Energy Credits & State Incentives – Upgrade to Sustainable Processes<\/em><\/h2>\n\n\n
\n
\"\"\/<\/figure><\/div>\n\n\n

With traditional UV curing processes, the tremendous heat associated with mercury UV lamps require a significant amount of electricity to operate. Phoseon UV LED technologies <\/a>provide energy savings of between 75 and 85 percent compared to prior drying systems. On average the annual operational cost savings for one 8 station flexo press is $50,000. In addition to ROI through energy consumption savings, there are utility rebates, and state incentives available which can significantly reduce the cost of upgrading to sustainable LED equipment<\/a>.<\/p>\n\n\n\n

In the past 12 months energy prices have increased 50-88% on a global scale. Have you considered contacting your energy company for rebates? Working through the process can be daunting, so we have a solution:<\/p>\n\n\n\n

Titan Energy (CT) has worked with end users to identify and apply for rebate\/funding dollars toward the purchase of Phoseon LED solutions<\/a>. Titan Energy is an independent energy consultancy firm with in- depth knowledge of energy procurement, demand-side management, and on-site generation services helping customers throughout North America. As a leader in the energy management industry, Titan Energy\u2019s ability to generate savings associated with reduced overall consumption has created a trusted reputation throughout North America.<\/p>\n\n\n\n

Titan Energy creates comprehensive energy management strategies utilizing data to control and reduce energy costs. Utilities nationwide are looking for large energy users to curtail energy use and are willing to fund energy efficiency projects.<\/p>\n\n\n\n

The Titan Process:<\/em><\/strong><\/p>\n\n\n\n

Analyze<\/em>: Titan conducts site assessments and the discovery of incentives available to you. They present reports on financial scenarios that maximize value. Titan helps design the efficiency project to fit your needs.<\/p>\n\n\n\n

Execute:<\/em> Titan then manages the project from start to finish, ensuring all work is completed to state and building standards. As the project manager, a key role is to secure rebates and incentives the project qualifies for. If required, they will arrange for project financing.<\/p>\n\n\n\n

Measure<\/em>: Titan will continue to provide regular reporting of energy savings to validate results.<\/p>\n\n\n\n

Solutions<\/em>: Reduce your energy bill by using less power. Titan offers solutions for lighting &amp; controls, HVAC upgrades, mechanical upgrades, weatherization, mechanical retrofits, gas conversions, utility incentive assessments, site audits, and maintenance service contracts.<\/p>\n\n\n\n

Case Study Success 1:<\/em><\/strong><\/p>\n\n\n\n

Challenge:<\/strong> Titan Energy performed a comprehensive analysis of a label manufacturer\u2019s facilities across the Northeast. This process uncovered funding incentives for equipment upgrades as well as eligibility for utility Demand Response programs. By approaching this challenge holistically, Titan helped the client execute a strategic energy procurement plan, ensuring that the customer\u2019s energy purchasing strategy was fully in line with their demand-side initiatives.<\/p>\n\n\n\n

Approach & Solution:<\/strong> Using an audit comparing the old UV curing technology and new Phoseon UV LED fixtures, Titan obtained utility incentives for a hybrid LED processing application by showing a significant reduction in energy use during the printing process. Covering 45% of the project costs, the new UV LED lighting fixtures reduced maintenance downtime and energy usage while increasing label production by 33%. Titan also assisted in designing and executing a peak load management plan, allowing the manufacturer to curtail usage when the electricity grid experiences peak demand conditions. This, along with lower overall usage from their LED upgrade, led to a 40% reduction in their ICAP tag. By structuring an energy procurement plan to ensure the customer received the full benefit of their capacity cost reduction, Titan\u2019s expertise was vital for this customer in maximizing savings.<\/p>\n\n\n\n

Results:<\/strong><\/p>\n\n\n\n